Aeroveda Technologies
Case Studies

Case Study: Reducing Furnace Downtime at a Powder Metallurgy Plant

Aeroveda Admin · 30 August 2026 · 1 min read · 1 views

A powder metallurgy manufacturer running continuous sintering furnaces was experiencing frequent hearth plate replacement due to warping under sustained thermal load.

The Challenge

Pure molybdenum hearth plates were deforming after approximately 400 production cycles, forcing unplanned maintenance windows and production delays.

The Solution

Switching to TZM molybdenum alloy hearth plates, engineered to the plant's specific load and thermal cycle profile, significantly improved component durability.

The Result

The facility extended hearth plate service life well beyond the previous baseline, reducing unplanned downtime and lowering total cost of ownership despite the higher per-unit material cost.

Have a question about this?

Our engineering team can advise on material selection and specifications for your furnace.

Related Articles